Dualization of MD 404
September 9, 2015
Category: Uncategorized,
Maryland SHA has released a Design-Build contract for the construction-conversion of MD 404 into a 4-lane highway.
This project has been desired by many motorist traveling to shore points along the Atlantic for many years and the Secretary of Transportation Pete Rahn wants to bring it to fruition in the most expedient way possible.
Project information can be accessed from the SHA site for Competitive Sealed Proposals (link). Additional information is available in the form of scroll plots of contract A and B and are available in three files:
MD_404_Contract_A_Scroll_Plot_No_1_Date_09-03-2015
MD_404_Contract_A_Scroll_Plot_No_2_Date_09-03-2015
MD_404_Contract_A_Scroll_Plot_No_3_Date_09-03-2015
MD_404_Contract_B_Scroll_Plot_No_1_Date_09-03-2015
MD_404_Contract_B_Scroll_Plot_No_2_Date_09-03-2015
MD_404_Contract_B_Scroll_Plot_No_3_Date_09-03-2015
This data has been provided without the guarantee of accuracy. All data has been released by the State of Maryland, Department of Transportation – State Highway Administration Highway Design Division.

